Permit: TR-UTL-0224-00243
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3731 S BOBBY DR
Address NEW:
3731 S BOBBY DR
Apply Date:
02/05/2024
Applicant:
Adrien Pineda
Description:
APC WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 3731 S BOBBY DR
Permit Reviews
Permit Number - TR-UTL-0224-00243
Permit Status: Complete
Permit Description: APC WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 3731 S BOBBY DR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/06/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00243
Permit Status: Complete
Permit Description: APC WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 3731 S BOBBY DR
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/06/2024 | Right of Way project area is within City of Tucson 411 Project area. Contact Nick Germanos at nick.germanos@tucson az.gov. Prior ro start of work. |
| 02/06/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 02/06/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00243
Permite Description: APC WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 3731 S BOBBY DR
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | no density reports or material tickets given |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00243
Permit Description: APC WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE AT 3731 S BOBBY DR
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/27/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 04/30/2024 | TRSP - ROW - Notice of Completion | Passed | asphalt was not opened for work. | |
| 01/31/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |