Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1721 S CHERRYBELL SV
Apply Date:
02/05/2024
Applicant:
Rene Villalobos
Description:
2740002 1721 S. Cherrybell Strav 14-14-19NE install fire hydrant south west corner of intersection S.Cherrybell Strav and E.Willits Way in easement; 10lf dirt/ MLM

Permit Reviews

Permit Number - TR-UTL-0224-00230
Permit Status: Complete
Permit Description: 2740002 1721 S. Cherrybell Strav 14-14-19NE install fire hydrant south west corner of intersection S.Cherrybell Strav and E.Willits Way in easement; 10lf dirt/ MLM
Start Date Submittal Complete Date Status  
02/05/2024 RIGHT-OF-WAY REVIEW v.1 02/05/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0224-00230
Permit Status: Complete
Permit Description: 2740002 1721 S. Cherrybell Strav 14-14-19NE install fire hydrant south west corner of intersection S.Cherrybell Strav and E.Willits Way in easement; 10lf dirt/ MLM
Total Outstanding Activity Conditions - 2
Date Name
02/05/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
02/05/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0224-00230
Permit Description: 2740002 1721 S. Cherrybell Strav 14-14-19NE install fire hydrant south west corner of intersection S.Cherrybell Strav and E.Willits Way in easement; 10lf dirt/ MLM
Total Completed Inspections - 6
Date Description Inspector Results Comments
03/14/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/18/2024 TRSP - ROW - SITE INSPECTION Passed
08/21/2025 TRSP - ROW - Barricade - Setup/Routine Passed
08/21/2025 TRSP - ROW - Barricade Takedown Passed
08/21/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
08/21/2025 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW