Permit: TR-UTL-0224-00229
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
330 E 7TH ST
Address NEW:
330 E 7TH ST
Apply Date:
02/05/2024
Applicant:
Caitlin Ripley
Description:
Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0224-00229
Permit Status: Inspections
Permit Description: Cox to trench 4' and bore 195' to install CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00229
Permit Status: Inspections
Permit Description: Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/05/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 02/12/2024 | Special Events Coordination Required |
| 02/14/2024 | Special Events |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0224-00229
Permite Description: Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | |
| 09/12/2025 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0224-00229
Permit Description: Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/12/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/12/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 04/12/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/12/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 04/12/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |