Permit: TR-UTL-0224-00229
Permit Details
Apply Date:
02/05/2024
Applicant:
Cox Communications
Description:
Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0224-00229
Permit Status: Issued
Permit Description: Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00229
Permit Status: Issued
Permit Description: Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
02/05/2024 | Traffic Control set-up approved between 7AM - 5PM |
02/12/2024 | Special Events Coordination Required |
02/14/2024 | Special Events |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-0224-00229
Permite Description: Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | |
05/29/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0224-00229
Permit Description: Cox to trench 4' and bore 195' to install CATV conduit for system tie.
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
04/12/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
04/12/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
04/12/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
04/12/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
04/12/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |