Permit: TR-UTL-0224-00203
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1470 E MILTON RD
Address NEW:
1470 E MILTON RD
Apply Date:
02/01/2024
Applicant:
eligio pena
Description:
1 5x5 bell hole in asphalt to replace gas line.
Permit Reviews
Permit Number - TR-UTL-0224-00203
Permit Status: Complete
Permit Description: 1 5x5 bell hole in asphalt to replace gas line.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00203
Permit Status: Complete
Permit Description: 1 5x5 bell hole in asphalt to replace gas line.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/02/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 02/02/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00203
Permite Description: 1 5x5 bell hole in asphalt to replace gas line.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | spoke to Sandra work had yet to be completed. Permit expired and needs renewal |
| 03/12/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | spoke to Sandra work had yet to be completed. Permit expired and needs renewal |
| 03/12/2024 | TRSP - ROW - Barricade Takedown | N/A | Re-inspection required | spoke to Sandra work had yet to be completed. Permit expired and needs renewal |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00203
Permit Description: 1 5x5 bell hole in asphalt to replace gas line.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/14/2024 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 08/21/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/30/2024 | TRSP - ROW - Notice of Completion | Passed |