Permit: TR-UTL-0223-00912
Permit Details
Apply Date:
02/17/2023
Applicant:
Desert Barricades LLC
Description:
WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer. See PI plans for details. (Permit already approved under TR-UTL-1222-00453, but will expire 03/07/23)
Permit Reviews
Permit Number - TR-UTL-0223-00912
Permit Status: Complete
Permit Description: WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer.
See PI plans for details. (Permit already approved under TR-UTL-1222-00453, but will expire 03/07/23)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/15/2023 | RIGHT-OF-WAY REVIEW v.1 | 03/16/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0223-00912
Permit Status: Complete
Permit Description: WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer.
See PI plans for details. (Permit already approved under TR-UTL-1222-00453, but will expire 03/07/23)
Date | Description | Comments |
---|---|---|
03/15/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
03/15/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0223-00912
Permite Description: WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer.
See PI plans for details. (Permit already approved under TR-UTL-1222-00453, but will expire 03/07/23)
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0223-00912
Permit Description: WO T56874 Remove one pole (2'), install one pole (2') and trench (10') to existing transformer.
See PI plans for details. (Permit already approved under TR-UTL-1222-00453, but will expire 03/07/23)
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/13/2023 | TRSP - ROW - Final/Close-Out | Passed |