Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0223-00871
Permit Details
Apply Date:
02/14/2023
Applicant:
Andres Amado
Description:
Maintenance of 54" waterline in west lane of Columbus Blvd. manholes will be utilized to enter the pipe at the location of Columbus Bl/Lester St.
Permit Reviews
Permit Number - TR-UTL-0223-00871
Permit Status: Complete
Permit Description: Maintenance of 54" waterline in west lane of Columbus Blvd. manholes will be utilized to enter the pipe at the location of Columbus Bl/Lester St.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/28/2023 | RIGHT-OF-WAY REVIEW v.1 | 03/01/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0223-00871
Permit Status: Complete
Permit Description: Maintenance of 54" waterline in west lane of Columbus Blvd. manholes will be utilized to enter the pipe at the location of Columbus Bl/Lester St.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
02/28/2023 | Traffic control set-up approved between 9AM - 3:30PM |
03/01/2023 | The following extended traffic control set-up times were approved: 24 Hr |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0223-00871
Permit Description: Maintenance of 54" waterline in west lane of Columbus Blvd. manholes will be utilized to enter the pipe at the location of Columbus Bl/Lester St.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/27/2023 | TRSP - ROW - Recurring | Passed | ||
09/27/2023 | TRSP - ROW - Final/Close-Out | Passed |