Permit: TR-UTL-0223-00854
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1630 S SAN JOSE DR
Address NEW:
1630 S SAN JOSE DR
Apply Date:
02/13/2023
Applicant:
National Barricade LLC.
Description:
(1) 4'X4' Bell hole in dirt with an approx. 36'X2' trench in pavement to install a new gas service. Crews will be working across S San Jose Dr.
Permit Reviews
Permit Number - TR-UTL-0223-00854
Permit Status: Complete
Permit Description: (1) 4'X4' Bell hole in dirt with an approx. 36'X2' trench in pavement to install a new gas service. Crews will be working across S San Jose Dr.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2023 | RIGHT-OF-WAY REVIEW v.1 | 03/02/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0223-00854
Permit Status: Complete
Permit Description: (1) 4'X4' Bell hole in dirt with an approx. 36'X2' trench in pavement to install a new gas service. Crews will be working across S San Jose Dr.
| Date | Description | Comments |
|---|---|---|
| 03/02/2023 | ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| 03/02/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0223-00854
Permite Description: (1) 4'X4' Bell hole in dirt with an approx. 36'X2' trench in pavement to install a new gas service. Crews will be working across S San Jose Dr.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) | |
| 03/09/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0223-00854
Permit Description: (1) 4'X4' Bell hole in dirt with an approx. 36'X2' trench in pavement to install a new gas service. Crews will be working across S San Jose Dr.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/02/2023 | TRSP - ROW - Recurring | Passed |