Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
02/13/2023
Applicant:
Think Safety Inc
Description:
Pothole & intercept existing conduit. Total 507ft in C.O.T. ROW. Will lower conduit & fiber run, relocate existing vault to new location per City of Tucson CIP SR14-Valencia Rd project. P.M. Bob Roggenthen C.O.T.

Permit Reviews

Permit Number - TR-UTL-0223-00849
Permit Status: Complete
Permit Description: Pothole & intercept existing conduit. Total 507ft in C.O.T. ROW. Will lower conduit & fiber run, relocate existing vault to new location per City of Tucson CIP SR14-Valencia Rd project. P.M. Bob Roggenthen C.O.T.
Start Date Submittal Complete Date Status  
03/01/2023 RIGHT-OF-WAY REVIEW v.1 03/10/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0223-00849
Permit Status: Complete
Permit Description: Pothole & intercept existing conduit. Total 507ft in C.O.T. ROW. Will lower conduit & fiber run, relocate existing vault to new location per City of Tucson CIP SR14-Valencia Rd project. P.M. Bob Roggenthen C.O.T.
Date Description Comments
03/06/2023 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0223-00849
Permite Description: Pothole & intercept existing conduit. Total 507ft in C.O.T. ROW. Will lower conduit & fiber run, relocate existing vault to new location per City of Tucson CIP SR14-Valencia Rd project. P.M. Bob Roggenthen C.O.T.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/29/2023 TRSP - ROW - Recurring N/A Complete (Recurring)

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0223-00849
Permit Description: Pothole & intercept existing conduit. Total 507ft in C.O.T. ROW. Will lower conduit & fiber run, relocate existing vault to new location per City of Tucson CIP SR14-Valencia Rd project. P.M. Bob Roggenthen C.O.T.
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/23/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/11/2023 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
9130 E VALENCIA RD TCP_V1.PDF DOCUMENTS VIEW
PRJ242537-1 TUCSON_V1.PDF DOCUMENTS VIEW