Permit: TR-UTL-0223-00826
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
1466 W SAINT MARYS RD
Address NEW:
1466 W SAINT MARYS RD
Apply Date:
02/09/2023
Applicant:
Brian Johnson
Description:
2 5x5 bellholes in blktop front to crew to repair gas leak
Permit Reviews
Permit Number - TR-UTL-0223-00826
Permit Status: Inspections
Permit Description: 2 5x5 bellholes in blktop front to crew to repair gas leak
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/16/2023 | RIGHT-OF-WAY REVIEW v.1 | 02/23/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0223-00826
Permit Status: Inspections
Permit Description: 2 5x5 bellholes in blktop front to crew to repair gas leak
| Date | Description | Comments |
|---|---|---|
| 02/22/2023 | THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** PLEASE CONTACT JODIE BROWN AT JODIE.BROWN@TUCSONAZ.GOV WITH ANY QUESTIONS ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
| 02/22/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0223-00826
Permite Description: 2 5x5 bellholes in blktop front to crew to repair gas leak
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2026 | TRSP - ROW - Notice of Completion | N/A | Re-inspection required | Need to replace curb and gutter they just put asphalt patch over the top |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0223-00826
Permit Description: 2 5x5 bellholes in blktop front to crew to repair gas leak
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/02/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I met with Jeremy from Southwest gas. Went over preconstruction script. Discussed housekeeping, ADA walkway for the lane closure, asphalt, repair, and time of work, which will be 9 AM to 3:30 PM. |