Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1889 N KOLB RD
Address NEW:
1889 N KOLB RD
Apply Date:
02/07/2023
Applicant:
Andrea Charles
Description:
Installing new underground cable and fiber for a total of 4,300' Phase 5 of 5

Permit Reviews

Permit Number - TR-UTL-0223-00797
Permit Status: Complete
Permit Description: Installing new underground cable and fiber for a total of 4,300' Phase 5 of 5
Start Date Submittal Complete Date Status  
03/14/2023 RIGHT-OF-WAY REVIEW v.2 04/18/2023 APPROVED Review Details
02/16/2023 RIGHT-OF-WAY REVIEW v.1 02/28/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0223-00797
Permit Status: Complete
Permit Description: Installing new underground cable and fiber for a total of 4,300' Phase 5 of 5
Total Outstanding Activity Conditions - 2
Date Name
04/18/2023 Land survey required.
04/18/2023 Pavement Moratorium

Conditions

Permit Number - TR-UTL-0223-00797
Permit Status: Complete
Permit Description: Installing new underground cable and fiber for a total of 4,300' Phase 5 of 5
Date Description Comments
02/17/2023 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
02/17/2023 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0223-00797
Permite Description: Installing new underground cable and fiber for a total of 4,300' Phase 5 of 5
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/31/2023 TRSP - ROW - SITE INSPECTION N/A Complete (Recurring)

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0223-00797
Permit Description: Installing new underground cable and fiber for a total of 4,300' Phase 5 of 5
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/14/2023 TRSP - ROW - Recurring Passed
11/27/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/13/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
WYCO46011---REVISED_V1.PDF DOCUMENTS VIEW
WYCO46012---REVISED_V1.PDF DOCUMENTS VIEW
WYCO4602--REVISED_V2.PDF DOCUMENTS VIEW
REVISED DESIGN FOR CITY OF TUCSON PERMIT_V2.PDF DOCUMENTS VIEW
953054-CITY OF TUCSON----SECTION 2.2_V1.PDF DOCUMENTS VIEW
DESIGN FOR CITY OF TUCSON PERMIT---SECTION 2.2_V1.PDF DOCUMENTS VIEW
WYCO4602---SECTION 2.2_V1.PDF DOCUMENTS VIEW