Permit: TR-UTL-0126-00197
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
621 E DRACHMAN ST
Address NEW:
621 E DRACHMAN ST
Apply Date:
01/30/2026
Applicant:
eligio pena
Description:
5X5 BELL HOLE IN ASPHALT / CONCRETE TO REPLACE GAS LINE.
Permit Reviews
Permit Number - TR-UTL-0126-00197
Permit Status: In review
Permit Description: 5X5 BELL HOLE IN ASPHALT / CONCRETE TO REPLACE GAS LINE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/04/2026 | REQUIRES RESUBMIT |
| 02/05/2026 | RIGHT-OF-WAY REVIEW v.2 | 02/05/2026 | VOID |
Outstanding Activity Conditions
Permit Number - TR-UTL-0126-00197
Permit Status: In review
Permit Description: 5X5 BELL HOLE IN ASPHALT / CONCRETE TO REPLACE GAS LINE.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/03/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 02/03/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/05/2026 | Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way. |
| 02/05/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property |