Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
548 E 1ST ST
Address NEW:
548 E 1ST ST
Apply Date:
01/29/2026
Applicant:
Ilana Galluzzo
Description:
Emergency permit for work being done at 548 E 1ST ST on gas pipeline.

Permit Reviews

Permit Number - TR-UTL-0126-00190
Permit Status: Inspections
Permit Description: Emergency permit for work being done at 548 E 1ST ST on gas pipeline.
Start Date Submittal Complete Date Status  
01/29/2026 RIGHT-OF-WAY REVIEW v.1 01/30/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0126-00190
Permit Status: Inspections
Permit Description: Emergency permit for work being done at 548 E 1ST ST on gas pipeline.
Total Outstanding Activity Conditions - 2
Date Name
01/30/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/30/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0126-00190
Permit Description: Emergency permit for work being done at 548 E 1ST ST on gas pipeline.
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/10/2026 TRSP - ROW - Final Passed permanent patches in place standard t top has been fixed correctly all work completed