Permit: TR-UTL-0126-00173
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
762 W GLENN ST
Address NEW:
762 W GLENN ST
Apply Date:
01/27/2026
Applicant:
Ilana Galluzzo
Description:
5' x 5' bell hole in dirt in rear easement of property to install new gas service.
Permit Reviews
Permit Number - TR-UTL-0126-00173
Permit Status: Complete
Permit Description: 5' x 5' bell hole in dirt in rear easement of property to install new gas service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/27/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/30/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0126-00173
Permit Status: Complete
Permit Description: 5' x 5' bell hole in dirt in rear easement of property to install new gas service.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/29/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 01/29/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 01/30/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 01/30/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/30/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0126-00173
Permit Description: 5' x 5' bell hole in dirt in rear easement of property to install new gas service.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/03/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/03/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | All work completed in the back alley new service | |
| 04/03/2026 | TRSP - ROW - Final | Passed | All work completed in the back alley new service |