Permit: TR-UTL-0126-00162
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
10201 S SWAN RD
Address NEW:
10201 S SWAN RD
Apply Date:
01/26/2026
Applicant:
Angeline Trejo
Description:
P.336656-3 - PLACE 2771' OF AERIAL CABLE - OG PERMIT - TR-UTL-0925-01513 03/05/26- Denied due to pre-activity schedule or requested to schedule. 03/06/26- Renew permit for 60 days as of 03/18/26 new expiration date 05/17/26
Permit Reviews
Permit Number - TR-UTL-0126-00162
Permit Status: Complete
Permit Description: P.336656-3 - PLACE 2771' OF AERIAL CABLE - OG PERMIT - TR-UTL-0925-01513
03/05/26- Denied due to pre-activity schedule or requested to schedule.
03/06/26- Renew permit for 60 days as of 03/18/26 new expiration date 05/17/26
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/30/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0126-00162
Permit Status: Complete
Permit Description: P.336656-3 - PLACE 2771' OF AERIAL CABLE - OG PERMIT - TR-UTL-0925-01513
03/05/26- Denied due to pre-activity schedule or requested to schedule.
03/06/26- Renew permit for 60 days as of 03/18/26 new expiration date 05/17/26
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/28/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/30/2026 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 01/30/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/30/2026 | Replacement Pole The location of replacement poles, new poles, and supporting equipment must comply with the Americans with Disabilities Act, city construction and sidewalk clearance standards, city ordinances, and state and federal laws and regulations to provide a clear and safe passage within the rights-of-way. |
| 01/30/2026 | Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0126-00162
Permit Description: P.336656-3 - PLACE 2771' OF AERIAL CABLE - OG PERMIT - TR-UTL-0925-01513
03/05/26- Denied due to pre-activity schedule or requested to schedule.
03/06/26- Renew permit for 60 days as of 03/18/26 new expiration date 05/17/26
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Leanne from lumen over the phone on Wednesday, February 18 and allowed for work to begin while the online portal was having glitches and not allowing pre-cons to be scheduled. | |
| 05/21/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | minimal traffic control devices used for this job, only advanced warnings down adjacent roads. All have been picked up, job has been completed. | |
| 05/21/2026 | TRSP - ROW - Final | Passed | installation of overhead cable completed, traffic control devices removed from site, approved |