Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
3780 S PARK AV
Address NEW:
3780 S PARK AV
Apply Date:
01/21/2026
Applicant:
Aidan Willis
Description:
Zayo contractor to pull fiber thru existing underground conduit. Zayo contractor to access existing HH's to facilitate pull thru of fiber.

Permit Reviews

Permit Number - TR-UTL-0126-00139
Permit Status: Needs resubmittal
Permit Description: Zayo contractor to pull fiber thru existing underground conduit. Zayo contractor to access existing HH's to facilitate pull thru of fiber.
Start Date Submittal Complete Date Status  
01/21/2026 RIGHT-OF-WAY REVIEW v.1 01/28/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0126-00139
Permit Status: Needs resubmittal
Permit Description: Zayo contractor to pull fiber thru existing underground conduit. Zayo contractor to access existing HH's to facilitate pull thru of fiber.
Total Outstanding Activity Conditions - 4
Date Name
01/27/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/27/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
01/27/2026 Traffic control set-up approved between 9AM - 3:30PM
01/27/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.