Permit: TR-UTL-0126-00115
Permit Details
Apply Date:
01/19/2026
Applicant:
John Rhodes
Description:
Tie point will be existing aerial splice case on utility pole. Overlash 280' of 288ct fiber over 4 spans. Overlash 635' of 288ct fiber over 7 spans. Place 745' of new strand over 5 spans. Lash 745' of 288ct fiber over 5 spans. Place new riser.Bore 170' of 2" conduit at a depth of 3', run 170' of 288ct. Place new vault. Bore 670' of 2" conduit at a depth of 3', run 670' of 288ct. Place new vault. Bore 780' of 2" conduit at a depth of 3', run 780' of 288ct. Place new vault. Bore 560' of 2" conduit at a depth of 3', run 560' of 288ct. Place new vault. Bore 240' of 2" conduit at a depth of 3', run 240' of 288ct. Place new riser. Place 790' of new strand over 8 spans. Lash 745' of 288ct fiber over 8 spans.
Permit Reviews
Permit Number - TR-UTL-0126-00115
Permit Status: Issued
Permit Description: Tie point will be existing aerial splice case on utility pole. Overlash 280' of 288ct fiber over 4 spans. Overlash 635' of 288ct fiber over 7 spans. Place 745' of new strand over 5 spans. Lash 745' of 288ct fiber over 5 spans. Place new riser.Bore 170' of 2" conduit at a depth of 3', run 170' of 288ct. Place new vault. Bore 670' of 2" conduit at a depth of 3', run 670' of 288ct. Place new vault. Bore 780' of 2" conduit at a depth of 3', run 780' of 288ct. Place new vault. Bore 560' of 2" conduit at a depth of 3', run 560' of 288ct. Place new vault. Bore 240' of 2" conduit at a depth of 3', run 240' of 288ct. Place new riser. Place 790' of new strand over 8 spans. Lash 745' of 288ct fiber over 8 spans.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/26/2026 | REQUIRES RESUBMIT |
| 01/26/2026 | RIGHT-OF-WAY REVIEW v.2 | 01/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0126-00115
Permit Status: Issued
Permit Description: Tie point will be existing aerial splice case on utility pole. Overlash 280' of 288ct fiber over 4 spans. Overlash 635' of 288ct fiber over 7 spans. Place 745' of new strand over 5 spans. Lash 745' of 288ct fiber over 5 spans. Place new riser.Bore 170' of 2" conduit at a depth of 3', run 170' of 288ct. Place new vault. Bore 670' of 2" conduit at a depth of 3', run 670' of 288ct. Place new vault. Bore 780' of 2" conduit at a depth of 3', run 780' of 288ct. Place new vault. Bore 560' of 2" conduit at a depth of 3', run 560' of 288ct. Place new vault. Bore 240' of 2" conduit at a depth of 3', run 240' of 288ct. Place new riser. Place 790' of new strand over 8 spans. Lash 745' of 288ct fiber over 8 spans.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 01/22/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/27/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 01/27/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 01/27/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/27/2026 | Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations |
| 01/27/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |