Permit: TR-UTL-0126-00111
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
653 N SUNSTREAM LN
Address NEW:
653 N SUNSTREAM LN
Apply Date:
01/16/2026
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop for crews to obtain CP reads on gas facilities and test soil samples.
Permit Reviews
Permit Number - TR-UTL-0126-00111
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop for crews to obtain CP reads on gas facilities and test soil samples.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/21/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0126-00111
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop for crews to obtain CP reads on gas facilities and test soil samples.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/21/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign |
| 01/21/2026 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/21/2026 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0126-00111
Permit Description: 2 5x5 bellholes in dirt/blktop for crews to obtain CP reads on gas facilities and test soil samples.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/25/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/25/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/25/2026 | TRSP - ROW - Final | Passed |