Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9580 E 22ND ST
Address NEW:
9580 E 22ND ST
Apply Date:
01/15/2026
Applicant:
Aridai Rosas
Description:
R DIRECTIONAL CREWS WILL BE POTHOLING TO LOCATE SOUTHWEST GAS FACILITIES.

Permit Reviews

Permit Number - TR-UTL-0126-00098
Permit Status: Complete
Permit Description: R DIRECTIONAL CREWS WILL BE POTHOLING TO LOCATE SOUTHWEST GAS FACILITIES.
Start Date Submittal Complete Date Status  
01/15/2026 RIGHT-OF-WAY REVIEW v.1 01/21/2026 APPROVED Review Details
01/22/2026 RIGHT-OF-WAY REVIEW REVISION v.1 01/27/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0126-00098
Permit Status: Complete
Permit Description: R DIRECTIONAL CREWS WILL BE POTHOLING TO LOCATE SOUTHWEST GAS FACILITIES.
Total Outstanding Activity Conditions - 4
Date Name
01/20/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/20/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
01/20/2026 Traffic control set-up approved between 9AM - 3:30PM
01/20/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0126-00098
Permit Description: R DIRECTIONAL CREWS WILL BE POTHOLING TO LOCATE SOUTHWEST GAS FACILITIES.
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/26/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I met on site with Southwest gas and the contractor that will be doing the pot holing. All of the work will be in the dirt on the south side of 22nd with no impact to traffic only a shoulder closure.
02/18/2026 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete and traffic control has been removed. The traffic control set up did meet the requirements of the approved TCP.
02/18/2026 TRSP - ROW - Backfill - Placement/Compaction Passed All utility potholes were backfilled according to specifications
02/18/2026 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
22ND ST - CAMINO SECO REVISED TCP_V1.PDF DOCUMENTS VIEW
ADDITIONAL POTHOLES_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
22ND ST POTHOLING AERIAL SNIP_V1.PDF DOCUMENTS VIEW
22ND ST POTHOLING TCP_V1.PDF DOCUMENTS VIEW
36_5074816 POTHOLE EXHIBIT_V1.PDF DOCUMENTS VIEW