Permit: TR-UTL-0126-00098
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9580 E 22ND ST
Address NEW:
9580 E 22ND ST
Apply Date:
01/15/2026
Applicant:
Aridai Rosas
Description:
R DIRECTIONAL CREWS WILL BE POTHOLING TO LOCATE SOUTHWEST GAS FACILITIES.
Permit Reviews
Permit Number - TR-UTL-0126-00098
Permit Status: Complete
Permit Description: R DIRECTIONAL CREWS WILL BE POTHOLING TO LOCATE SOUTHWEST GAS FACILITIES.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/15/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/21/2026 | APPROVED |
| 01/22/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 01/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0126-00098
Permit Status: Complete
Permit Description: R DIRECTIONAL CREWS WILL BE POTHOLING TO LOCATE SOUTHWEST GAS FACILITIES.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 01/20/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 01/20/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 01/20/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/20/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0126-00098
Permit Description: R DIRECTIONAL CREWS WILL BE POTHOLING TO LOCATE SOUTHWEST GAS FACILITIES.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I met on site with Southwest gas and the contractor that will be doing the pot holing. All of the work will be in the dirt on the south side of 22nd with no impact to traffic only a shoulder closure. | |
| 02/18/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete and traffic control has been removed. The traffic control set up did meet the requirements of the approved TCP. | |
| 02/18/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | All utility potholes were backfilled according to specifications | |
| 02/18/2026 | TRSP - ROW - Final | Passed | Work is complete |