Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5066 E 28TH ST
Address NEW:
5066 E 28TH ST
Apply Date:
01/14/2026
Applicant:
ANGEL MORALES
Description:
P.348046 Kanha Bore 270' and trench 27' to place conduit and fiber cable. Pull 562' of fiber cable through existing conduit. Place 225' of aerial fiber cable. Place 5 HH

Permit Reviews

Permit Number - TR-UTL-0126-00087
Permit Status: Complete
Permit Description: P.348046 Kanha Bore 270' and trench 27' to place conduit and fiber cable. Pull 562' of fiber cable through existing conduit. Place 225' of aerial fiber cable. Place 5 HH
Start Date Submittal Complete Date Status  
01/14/2026 RIGHT-OF-WAY REVIEW v.1 01/20/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0126-00087
Permit Status: Complete
Permit Description: P.348046 Kanha Bore 270' and trench 27' to place conduit and fiber cable. Pull 562' of fiber cable through existing conduit. Place 225' of aerial fiber cable. Place 5 HH
Total Outstanding Activity Conditions - 7
Date Name
01/16/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
01/16/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination.
01/16/2026 Traffic control set-up approved between 9AM - 3:30PM
01/16/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
01/20/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
01/20/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/20/2026 Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0126-00087
Permit Description: P.348046 Kanha Bore 270' and trench 27' to place conduit and fiber cable. Pull 562' of fiber cable through existing conduit. Place 225' of aerial fiber cable. Place 5 HH
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/11/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Met on-site with Thomas from Pauley as well as Steven from Lumen. Several hand holes will be moved a short distance. On the east side, we are extending the boring to allow for a deeper bore to go under a ditch, and on the west side a cabinet will be moved as to not block a private entryway.
05/05/2026 TRSP - ROW - Barricade Takedown Passed all traffic control devices, including flagging lane, has been removed
05/05/2026 TRSP - ROW - AERIAL INSTALLATION Passed all aerial fiber complete, heights and slack approved
05/05/2026 TRSP - ROW - Final Passed all aerial work, trench/bore completed, traffic control devices removed, job completed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
P.348046 - TUCSON - PERMIT DESIGN 1-13-26_V1.PDF DOCUMENTS VIEW
P.348046 AERIAL SITE MAP_V1.PDF DOCUMENTS VIEW
P.348046 TCPS_V1.PDF DOCUMENTS VIEW