Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4130 S 2ND AV
Address NEW:
4130 S 2ND AV
Apply Date:
01/14/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 50'X2' TRENCH TO RE-ROUTE GAS MAIN IN ORDER TO ABANDON SERVICE THATS UNDER THE CONCRETE APRON ( ARIZONA PIPELINE WILL NEED 90 DAYS TO COMPLETE THIS WORK ORDER )

Permit Reviews

Permit Number - TR-UTL-0126-00084
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 50'X2' TRENCH TO RE-ROUTE GAS MAIN IN ORDER TO ABANDON SERVICE THATS UNDER THE CONCRETE APRON ( ARIZONA PIPELINE WILL NEED 90 DAYS TO COMPLETE THIS WORK ORDER )
Start Date Submittal Complete Date Status  
01/14/2026 RIGHT-OF-WAY REVIEW v.1 01/16/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0126-00084
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 50'X2' TRENCH TO RE-ROUTE GAS MAIN IN ORDER TO ABANDON SERVICE THATS UNDER THE CONCRETE APRON ( ARIZONA PIPELINE WILL NEED 90 DAYS TO COMPLETE THIS WORK ORDER )
Total Outstanding Activity Conditions - 3
Date Name
01/16/2026 Traffic Control set-up approved between 7AM - 5PM
01/16/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
01/16/2026 SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0126-00084
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 50'X2' TRENCH TO RE-ROUTE GAS MAIN IN ORDER TO ABANDON SERVICE THATS UNDER THE CONCRETE APRON ( ARIZONA PIPELINE WILL NEED 90 DAYS TO COMPLETE THIS WORK ORDER )
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/16/2026 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0126-00084
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 50'X2' TRENCH TO RE-ROUTE GAS MAIN IN ORDER TO ABANDON SERVICE THATS UNDER THE CONCRETE APRON ( ARIZONA PIPELINE WILL NEED 90 DAYS TO COMPLETE THIS WORK ORDER )
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/22/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/03/2026 TRSP - ROW - Barricade - Setup/Routine Passed
02/10/2026 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW