Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
10301 E EDNA PL
Address NEW:
10301 E EDNA PL
Apply Date:
01/07/2026
Applicant:
Angeline Trejo
Description:
(PGS 3-8) BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT Original Permit Approval on TR-UTL-0125-00166 05/28/26- Renew for 90 days as of 05/29/2026. New expiration date is 08/27/26.

Permit Reviews

Permit Number - TR-UTL-0126-00050
Permit Status: Inspections
Permit Description: (PGS 3-8) BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT Original Permit Approval on TR-UTL-0125-00166 05/28/26- Renew for 90 days as of 05/29/2026. New expiration date is 08/27/26.
Start Date Submittal Complete Date Status  
01/07/2026 RIGHT-OF-WAY REVIEW v.1 01/15/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0126-00050
Permit Status: Inspections
Permit Description: (PGS 3-8) BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT Original Permit Approval on TR-UTL-0125-00166 05/28/26- Renew for 90 days as of 05/29/2026. New expiration date is 08/27/26.
Total Outstanding Activity Conditions - 3
Date Name
01/13/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/13/2026 Traffic control set-up approved between 9AM - 3:30PM
01/13/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0126-00050
Permite Description: (PGS 3-8) BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT Original Permit Approval on TR-UTL-0125-00166 05/28/26- Renew for 90 days as of 05/29/2026. New expiration date is 08/27/26.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
08/21/2026 TRSP - ROW - Barricade - Setup/Routine N/A Complete (Recurring) job is ongoing, conduit work still ongoing near hospital entrance
08/21/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Complete (Recurring) ongoing excavation work near hospital entrance
08/21/2026 TRSP - ROW - Final N/A Not Ready job is still ongoing, working under new permit

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0126-00050
Permit Description: (PGS 3-8) BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT Original Permit Approval on TR-UTL-0125-00166 05/28/26- Renew for 90 days as of 05/29/2026. New expiration date is 08/27/26.
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/21/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Joe and Angeline, work is ongoing under new permit 0126-00052