Permit: TR-UTL-0126-00013
Permit Details
Status:
Approved
Type:
Right-of-Way (ROW) - Utility
Address:
343 S SCOTT AV UNIT 6
Address NEW:
343 S SCOTT AV UNIT 6
Apply Date:
01/05/2026
Applicant:
Irvin Beltran
Description:
Excavating a 4x2 trench at 343 S SCOTT AVE #6 in ROW in asphalt and dirt to replace gas service.
Permit Reviews
Permit Number - TR-UTL-0126-00013
Permit Status: Approved
Permit Description: Excavating a 4x2 trench at 343 S SCOTT AVE #6 in ROW in asphalt and dirt to replace gas service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/16/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0126-00013
Permit Status: Approved
Permit Description: Excavating a 4x2 trench at 343 S SCOTT AVE #6 in ROW in asphalt and dirt to replace gas service.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/08/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 01/09/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 01/09/2026 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 01/09/2026 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/09/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |