Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0125-00192
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5700 E PIMA ST
Address NEW:
5700 E PIMA ST
Apply Date:
01/30/2025
Applicant:
Cox Communications
Description:
Barricade only: PRJ286910-1: Cox to overlash 2000ft to existing aerial strand and pull 100' through existing CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0125-00192
Permit Status: Complete
Permit Description: Barricade only: PRJ286910-1: Cox to overlash 2000ft to existing aerial strand and pull 100' through existing CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00192
Permit Status: Complete
Permit Description: Barricade only: PRJ286910-1: Cox to overlash 2000ft to existing aerial strand and pull 100' through existing CATV conduit for system tie.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/31/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 02/03/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/03/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00192
Permit Description: Barricade only: PRJ286910-1: Cox to overlash 2000ft to existing aerial strand and pull 100' through existing CATV conduit for system tie.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/18/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/25/2025 | TRSP - ROW - Final | Passed |