Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8015 S RITA RD
Address NEW:
8015 S RITA RD
Apply Date:
01/30/2025
Applicant:
Ilana Galluzzo
Description:
3' x 5' BELL HOLE IN DIRT WITH AN APPROX. 2' x 150' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE.

Permit Reviews

Permit Number - TR-UTL-0125-00191
Permit Status: Complete
Permit Description: 3' x 5' BELL HOLE IN DIRT WITH AN APPROX. 2' x 150' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE.
Start Date Submittal Complete Date Status  
02/03/2025 RIGHT-OF-WAY REVIEW v.2 02/04/2025 APPROVED Review Details
01/30/2025 RIGHT-OF-WAY REVIEW v.1 01/31/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00191
Permit Status: Complete
Permit Description: 3' x 5' BELL HOLE IN DIRT WITH AN APPROX. 2' x 150' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE.
Total Outstanding Activity Conditions - 2
Date Name
01/31/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/31/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00191
Permit Description: 3' x 5' BELL HOLE IN DIRT WITH AN APPROX. 2' x 150' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/11/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Job is being completed behind sidewalk in landscape area, no traffic control necessary for work performance, met with Ricardo from NPL on site, estimate to complete job by end of day 2/12
03/12/2025 TRSP - ROW - Barricade - Setup/Routine Passed work is complete and a traffic control setup inspection was never requested.
03/12/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is already completed on this permit. A backfill inspection was never requested, but all work was done behind sidewalk in native soil.
03/12/2025 TRSP - ROW - Final Passed All work was completed behind the sidewalk in native soil

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
8015 S RITA RD 4907223_V1.PDF DOCUMENTS VIEW
8015 S RITA RD TCP REVISED_V2.PDF DOCUMENTS VIEW