Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address NEW:
6347 S FONTANA AV
Apply Date:
01/30/2025
Applicant:
Ilana Galluzzo
Description:
3' x 5' BELL HOLE IN CONCRETE WITH AN APPROX. 2' x 4' TRENCH IN CONCRETE/DIRT TO INSTALL NEW GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-0125-00190
Permit Status: Inspections
Permit Description: 3' x 5' BELL HOLE IN CONCRETE WITH AN APPROX. 2' x 4' TRENCH IN CONCRETE/DIRT TO INSTALL NEW GAS SERVICE
Start Date Submittal Complete Date Status  
01/30/2025 RIGHT-OF-WAY REVIEW v.1 01/31/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00190
Permit Status: Inspections
Permit Description: 3' x 5' BELL HOLE IN CONCRETE WITH AN APPROX. 2' x 4' TRENCH IN CONCRETE/DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 2
Date Name
01/31/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/31/2025 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0125-00190
Permite Description: 3' x 5' BELL HOLE IN CONCRETE WITH AN APPROX. 2' x 4' TRENCH IN CONCRETE/DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/03/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
04/03/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0125-00190
Permit Description: 3' x 5' BELL HOLE IN CONCRETE WITH AN APPROX. 2' x 4' TRENCH IN CONCRETE/DIRT TO INSTALL NEW GAS SERVICE
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/05/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/03/2025 TRSP - ROW - Barricade - Setup/Routine Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
6347 S FONTANA AVE 4747877_V1.PDF DOCUMENTS VIEW
6347 S FONTANA AVE TCP_V1.PDF DOCUMENTS VIEW