Permit: TR-UTL-0125-00181
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3524 S SARNOFF DR
Address NEW:
3524 S SARNOFF DR
Apply Date:
01/28/2025
Applicant:
Cox Communications
Description:
PRJ285822-1: Cox to trench 24' and bore 279' to place 1 -2" conduit for a service repair order
Permit Reviews
Permit Number - TR-UTL-0125-00181
Permit Status: Complete
Permit Description: PRJ285822-1: Cox to trench 24' and bore 279' to place 1 -2" conduit for a service repair order
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00181
Permit Status: Complete
Permit Description: PRJ285822-1: Cox to trench 24' and bore 279' to place 1 -2" conduit for a service repair order
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/30/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 01/30/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 01/30/2025 | NOTE: WORK IS BEHIND 3524 S SARNOFF DR - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00181
Permite Description: PRJ285822-1: Cox to trench 24' and bore 279' to place 1 -2" conduit for a service repair order
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2025 | TRSP - ROW - Final | N/A | Deferred | Work is complete. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00181
Permit Description: PRJ285822-1: Cox to trench 24' and bore 279' to place 1 -2" conduit for a service repair order
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work for this permit has already begun. A pre-con was never scheduled. | |
| 03/24/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |