Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
120 E 22ND ST
Address NEW:
120 E 22ND ST
Apply Date:
01/28/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ALLEY IN ORDER TO ABANDON GAS SERVICE FOR 120 E 22ND ST

Permit Reviews

Permit Number - TR-UTL-0125-00177
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ALLEY IN ORDER TO ABANDON GAS SERVICE FOR 120 E 22ND ST
Start Date Submittal Complete Date Status  
01/28/2025 RIGHT-OF-WAY REVIEW v.1 01/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00177
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ALLEY IN ORDER TO ABANDON GAS SERVICE FOR 120 E 22ND ST
Total Outstanding Activity Conditions - 4
Date Name
01/28/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/28/2025 Traffic Control set-up approved between 7AM - 5PM
01/29/2025 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
01/29/2025 Alley Restrictions  Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00177
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ALLEY IN ORDER TO ABANDON GAS SERVICE FOR 120 E 22ND ST
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/03/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed
04/02/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
04/02/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW