Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0125-00168
Permit Details
Apply Date:
01/27/2025
Applicant:
ANGEL MORALES
Description:
N.795915 - 3 : (PAGES 14-16 IN DESIGN PLAN) ON S HOUGHTON RD FROM E KEYSTONE DR TO IRVINGTON RD. BORE/TRENCH 3170' +,DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES & REMOVE/REPLACE ASPHALT Tucson CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte *This permit application's civil plans have been reviewed and approved by PSOMAS engineering per the City’s requirement
Permit Reviews
Permit Number - TR-UTL-0125-00168
Permit Status: Approved
Permit Description: N.795915 - 3 : (PAGES 14-16 IN DESIGN PLAN) ON S HOUGHTON RD FROM E KEYSTONE DR TO IRVINGTON RD.
BORE/TRENCH 3170' +,DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES & REMOVE/REPLACE ASPHALT
Tucson CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte
*This permit application's civil plans have been reviewed and approved by PSOMAS engineering per the City’s requirement
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/20/2025 | RIGHT-OF-WAY REVIEW v.2 | 02/23/2025 | APPROVED |
01/27/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/18/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00168
Permit Status: Approved
Permit Description: N.795915 - 3 : (PAGES 14-16 IN DESIGN PLAN) ON S HOUGHTON RD FROM E KEYSTONE DR TO IRVINGTON RD.
BORE/TRENCH 3170' +,DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES & REMOVE/REPLACE ASPHALT
Tucson CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte
*This permit application's civil plans have been reviewed and approved by PSOMAS engineering per the City’s requirement
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
01/30/2025 | PRE-CON/PAVEMENT/SIDEWALK |
01/30/2025 | Traffic control set-up approved between 9AM - 3:30PM |
01/30/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |