Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
10301 E EDNA PL
Address NEW:
10301 E EDNA PL
Apply Date:
01/27/2025
Applicant:
Andrea Charles
Description:
Renew in 90 days as of 05/29/2025 new expiration date 08/27/2025 --90 DAY PERMIT EXTENSION REQUESTED, JOB WAS DELAYED-- N.795915 - 1 : ( PAGES 3-8 OF DESIGN PLAN) HOUGHTON FROM E EDNA PL (SOUTH OF 22ND ST) SOUTH TO E FALCON POINT DR (SOUTH OF GOLF LINKS). BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT. CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte This permit applications' civil plans have been reviewed and approved by PSOMAS engineering - per the City’s requirement.

Permit Reviews

Permit Number - TR-UTL-0125-00166
Permit Status: Inspections
Permit Description: Renew in 90 days as of 05/29/2025 new expiration date 08/27/2025 --90 DAY PERMIT EXTENSION REQUESTED, JOB WAS DELAYED-- N.795915 - 1 : ( PAGES 3-8 OF DESIGN PLAN) HOUGHTON FROM E EDNA PL (SOUTH OF 22ND ST) SOUTH TO E FALCON POINT DR (SOUTH OF GOLF LINKS). BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT. CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte This permit applications' civil plans have been reviewed and approved by PSOMAS engineering - per the City’s requirement.
Start Date Submittal Complete Date Status  
02/18/2025 RIGHT-OF-WAY REVIEW v.2 02/20/2025 APPROVED Review Details
01/27/2025 RIGHT-OF-WAY REVIEW v.1 02/14/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00166
Permit Status: Inspections
Permit Description: Renew in 90 days as of 05/29/2025 new expiration date 08/27/2025 --90 DAY PERMIT EXTENSION REQUESTED, JOB WAS DELAYED-- N.795915 - 1 : ( PAGES 3-8 OF DESIGN PLAN) HOUGHTON FROM E EDNA PL (SOUTH OF 22ND ST) SOUTH TO E FALCON POINT DR (SOUTH OF GOLF LINKS). BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT. CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte This permit applications' civil plans have been reviewed and approved by PSOMAS engineering - per the City’s requirement.
Total Outstanding Activity Conditions - 4
Date Name
01/30/2025 Multiple jurisdictions/ IGA
01/30/2025 PRE-CON/PAVEMENT/SIDEWALK
01/30/2025 Traffic control set-up approved between 9AM - 3:30PM
01/30/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0125-00166
Permite Description: Renew in 90 days as of 05/29/2025 new expiration date 08/27/2025 --90 DAY PERMIT EXTENSION REQUESTED, JOB WAS DELAYED-- N.795915 - 1 : ( PAGES 3-8 OF DESIGN PLAN) HOUGHTON FROM E EDNA PL (SOUTH OF 22ND ST) SOUTH TO E FALCON POINT DR (SOUTH OF GOLF LINKS). BORE /TRENCH 5,280 ' , DIG PITS, ADJUST MH TO GRADE, PLACE NEW HHS/MHS/TRAC CLOSURES, & REMOVE/REPLACE ASPHALT. CAPITAL IMPROVEMENT PROJECT Manager - Kyle Dewitte This permit applications' civil plans have been reviewed and approved by PSOMAS engineering - per the City’s requirement.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/29/2025 TRSP - ROW - Barricade - Setup/Routine N/A Not Ready Project has been delayed. The permit has been extended for 90 days. Waiting for work to begin.
05/29/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Not Ready Project has been delayed. The permit has been extended for 90 days. Waiting for work to begin.
05/29/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Not Ready Project has been delayed. The permit has been extended for 90 days. Waiting for work to begin.
05/29/2025 TRSP - ROW - Final N/A Not Ready Project has been delayed. The permit has been extended for 90 days. Waiting for work to begin.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
N.759915 CIVIL SHEETS 12_18_2024_PERMIT APPLICATION_V1.PDF DOCUMENTS VIEW
N.795915 SATELLITE PLAN_V1.PDF DOCUMENTS VIEW
N.795915-TCPS 1-3 REV1_V2.PDF DOCUMENTS VIEW