Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
850 E SPEEDWAY BL
Apply Date:
01/27/2025
Applicant:
ANGEL MORALES
Description:
P.263629 - REMOVE 2 POLES, PLACE 1 HH, DIG 3 PITS ,REMOVE/REPLACE 16 SQFT OF CONCRETE, AND ACCESS MH 7847 FOR SPLCING

Permit Reviews

Permit Number - TR-UTL-0125-00162
Permit Status: Complete
Permit Description: P.263629 - REMOVE 2 POLES, PLACE 1 HH, DIG 3 PITS ,REMOVE/REPLACE 16 SQFT OF CONCRETE, AND ACCESS MH 7847 FOR SPLCING
Start Date Submittal Complete Date Status  
03/24/2025 RIGHT-OF-WAY REVIEW REVISION v.1 03/25/2025 APPROVED Review Details
01/27/2025 RIGHT-OF-WAY REVIEW v.1 01/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00162
Permit Status: Complete
Permit Description: P.263629 - REMOVE 2 POLES, PLACE 1 HH, DIG 3 PITS ,REMOVE/REPLACE 16 SQFT OF CONCRETE, AND ACCESS MH 7847 FOR SPLCING
Total Outstanding Activity Conditions - 2
Date Name
01/29/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
03/26/2025 The following extended traffic control set-up times were approved: 24 HOURS

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00162
Permit Description: P.263629 - REMOVE 2 POLES, PLACE 1 HH, DIG 3 PITS ,REMOVE/REPLACE 16 SQFT OF CONCRETE, AND ACCESS MH 7847 FOR SPLCING
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/24/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/28/2025 TRSP - ROW - Barricade - Setup/Routine Passed
04/04/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
04/04/2025 TRSP - ROW - Final Passed