Permit: TR-UTL-0125-00162
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
850 E SPEEDWAY BL
Address NEW:
850 E SPEEDWAY BL
Apply Date:
01/27/2025
Applicant:
ANGEL MORALES
Description:
P.263629 - REMOVE 2 POLES, PLACE 1 HH, DIG 3 PITS ,REMOVE/REPLACE 16 SQFT OF CONCRETE, AND ACCESS MH 7847 FOR SPLCING
Permit Reviews
Permit Number - TR-UTL-0125-00162
Permit Status: Complete
Permit Description: P.263629 - REMOVE 2 POLES, PLACE 1 HH, DIG 3 PITS ,REMOVE/REPLACE 16 SQFT OF CONCRETE, AND ACCESS MH 7847 FOR SPLCING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/24/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 03/25/2025 | APPROVED |
| 01/27/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00162
Permit Status: Complete
Permit Description: P.263629 - REMOVE 2 POLES, PLACE 1 HH, DIG 3 PITS ,REMOVE/REPLACE 16 SQFT OF CONCRETE, AND ACCESS MH 7847 FOR SPLCING
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/29/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 03/26/2025 | The following extended traffic control set-up times were approved: 24 HOURS |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00162
Permit Description: P.263629 - REMOVE 2 POLES, PLACE 1 HH, DIG 3 PITS ,REMOVE/REPLACE 16 SQFT OF CONCRETE, AND ACCESS MH 7847 FOR SPLCING
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/28/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/04/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/04/2025 | TRSP - ROW - Final | Passed |