Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2320 N CAMPBELL AV
Apply Date:
01/23/2025
Applicant:
Charles Larrabee
Description:
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (2) 5X5 BELL HOLES IN THE ASPHALT ALONG WITH (1) 30X3 TRENCH IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FO 2314 N CAMPBELL AVE

Permit Reviews

Permit Number - TR-UTL-0125-00137
Permit Status: Complete
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (2) 5X5 BELL HOLES IN THE ASPHALT ALONG WITH (1) 30X3 TRENCH IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FO 2314 N CAMPBELL AVE
Start Date Submittal Complete Date Status  
01/23/2025 RIGHT-OF-WAY REVIEW v.1 01/27/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00137
Permit Status: Complete
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (2) 5X5 BELL HOLES IN THE ASPHALT ALONG WITH (1) 30X3 TRENCH IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FO 2314 N CAMPBELL AVE
Total Outstanding Activity Conditions - 2
Date Name
01/27/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/27/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00137
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (2) 5X5 BELL HOLES IN THE ASPHALT ALONG WITH (1) 30X3 TRENCH IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FO 2314 N CAMPBELL AVE
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/31/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/27/2025 TRSP - ROW - Barricade - Setup/Routine Passed
02/25/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
03/05/2025 TRSP - ROW - Final Passed