Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3700 S CALLE POLAR
Apply Date:
01/21/2025
Applicant:
Cox Communications
Description:
Cox to aerial overlash 4,620', trench 23' and bore 123' to install conduit and place vaulted ped for system tie.

Permit Reviews

Permit Number - TR-UTL-0125-00127
Permit Status: Complete
Permit Description: Cox to aerial overlash 4,620', trench 23' and bore 123' to install conduit and place vaulted ped for system tie.
Start Date Submittal Complete Date Status  
01/22/2025 RIGHT-OF-WAY REVIEW v.1 01/28/2025 REQUIRES RESUBMIT Review Details
02/04/2025 RIGHT-OF-WAY REVIEW v.2 02/05/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00127
Permit Status: Complete
Permit Description: Cox to aerial overlash 4,620', trench 23' and bore 123' to install conduit and place vaulted ped for system tie.
Total Outstanding Activity Conditions - 3
Date Name
01/27/2025 Traffic control set-up approved between 9AM - 3:30PM
01/27/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
01/27/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00127
Permit Description: Cox to aerial overlash 4,620', trench 23' and bore 123' to install conduit and place vaulted ped for system tie.
Total Completed Inspections - 6
Date Description Inspector Results Comments
02/20/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Kevin and Francisco, underground portion to be completed in full tomorrow, aerial work to start next Tuesday through Friday
02/26/2025 TRSP - ROW - Backfill - Placement/Compaction Passed trenching route ran from private property to pedestal then northbound to pole riser, backfilled in landscape area using native soil compacted to 85%, approved
03/05/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete. Therefore a traffic control set up inspection is no longer needed.
03/05/2025 TRSP - ROW - AERIAL INSTALLATION Passed Work is complete
03/11/2025 TRSP - ROW - Barricade Takedown Passed Traffic control was removed
03/18/2025 TRSP - ROW - Final Passed Work is done and permit is expired

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PRJ285000-1 TUCSON_V1.PDF DOCUMENTS VIEW
PRJ285000-1__TCP REV 1_V2.PDF DOCUMENTS VIEW