Permit: TR-UTL-0125-00121
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
758 S COLUMBUS BL
Address NEW:
758 S COLUMBUS BL
Apply Date:
01/21/2025
Applicant:
Cox Communications
Description:
Cox aerial maintenance to be done on poles
Permit Reviews
Permit Number - TR-UTL-0125-00121
Permit Status: Complete
Permit Description: Cox aerial maintenance to be done on poles
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00121
Permit Status: Complete
Permit Description: Cox aerial maintenance to be done on poles
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/27/2025 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 01/27/2025 | Approved for Work at 758 S COLUMBUS BL - On Columbus between E Santa Barbara Av & E Paseo Dorado. |
| 01/27/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/27/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 01/27/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00121
Permit Description: Cox aerial maintenance to be done on poles
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/20/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 02/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/27/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 03/05/2025 | TRSP - ROW - Final | Passed |