Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8701 E ALMOND ST
Address NEW:
8701 E ALMOND ST
Apply Date:
01/20/2025
Applicant:
Chelsey Bolinger
Description:
P.067198C (KAHNA) – Previously approved/expired permit TR-UTL-0624-01112 - BORE 5,253’, TRENCH 64’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (44) HANDHOLES & (12) PEDSTALS.

Permit Reviews

Permit Number - TR-UTL-0125-00117
Permit Status: Complete
Permit Description: P.067198C (KAHNA) – Previously approved/expired permit TR-UTL-0624-01112 - BORE 5,253’, TRENCH 64’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (44) HANDHOLES & (12) PEDSTALS.
Start Date Submittal Complete Date Status  
01/22/2025 RIGHT-OF-WAY REVIEW v.1 01/24/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00117
Permit Status: Complete
Permit Description: P.067198C (KAHNA) – Previously approved/expired permit TR-UTL-0624-01112 - BORE 5,253’, TRENCH 64’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (44) HANDHOLES & (12) PEDSTALS.
Total Outstanding Activity Conditions - 3
Date Name
01/23/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/23/2025 Traffic control set-up approved between 9AM - 3:30PM
01/24/2025 Driveways and private property shall not be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00117
Permit Description: P.067198C (KAHNA) – Previously approved/expired permit TR-UTL-0624-01112 - BORE 5,253’, TRENCH 64’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (44) HANDHOLES & (12) PEDSTALS.
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/06/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work completed under previously approved/expired permit TR-UTL-0624-01112
05/06/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work completed under previously approved/expired permit TR-UTL-0624-01112
05/06/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work completed under previously approved/expired permit TR-UTL-0624-01112
05/06/2025 TRSP - ROW - Final Passed Work completed under previously approved/expired permit TR-UTL-0624-01112

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.067198C - CITY OF TUCSON AERIAL MAP_01202025_V1.PDF DOCUMENTS VIEW
P.067198C - CITY OF TUCSON PLANS_01202025_V1.PDF DOCUMENTS VIEW
P.067198C - CITY OF TUCSON TCP_01202025_V1.PDF DOCUMENTS VIEW