Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3535 S VICTORIA AV
Apply Date:
01/17/2025
Applicant:
Chelsey Bolinger
Description:
P.067196G (KAHNA) - Previously approved/expired permit TR-UTL-0624-01107 - BORE 3,556' & TRENCH 152’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (21) HANDHOLES & (5) PEDS.

Permit Reviews

Permit Number - TR-UTL-0125-00116
Permit Status: Complete
Permit Description: P.067196G (KAHNA) - Previously approved/expired permit TR-UTL-0624-01107 - BORE 3,556' & TRENCH 152’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (21) HANDHOLES & (5) PEDS.
Start Date Submittal Complete Date Status  
01/21/2025 RIGHT-OF-WAY REVIEW v.1 01/28/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00116
Permit Status: Complete
Permit Description: P.067196G (KAHNA) - Previously approved/expired permit TR-UTL-0624-01107 - BORE 3,556' & TRENCH 152’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (21) HANDHOLES & (5) PEDS.
Total Outstanding Activity Conditions - 3
Date Name
01/27/2025 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
01/27/2025 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
01/27/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00116
Permit Description: P.067196G (KAHNA) - Previously approved/expired permit TR-UTL-0624-01107 - BORE 3,556' & TRENCH 152’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (21) HANDHOLES & (5) PEDS.
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/07/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work completed under previously approved/expired permit TR-UTL-0624-01107
05/07/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work completed under previously approved/expired permit TR-UTL-0624-01107
05/07/2025 TRSP - ROW - Final Passed Work completed under previously approved/expired permit TR-UTL-0624-01107

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.067196G - CITY OF TUCSON AERIAL MAP - 01-17-2025_V1.PDF DOCUMENTS VIEW
P.067196G - CITY OF TUCSON PLANS - 01-17-2025_V1.PDF DOCUMENTS VIEW
P.067196G - CITY OF TUCSON TCP - 01-17-2025_V1.PDF DOCUMENTS VIEW