Permit: TR-UTL-0125-00100
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3085 S KOLB RD
Address NEW:
3085 S KOLB RD
Apply Date:
01/16/2025
Applicant:
Desert Barricades LLC
Description:
WO T83703. TEP TO REPLACE 2,725' OF OVERHEAD WIRE.
Permit Reviews
Permit Number - TR-UTL-0125-00100
Permit Status: Complete
Permit Description: WO T83703. TEP TO REPLACE 2,725' OF OVERHEAD WIRE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/17/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/21/2025 | REQUIRES RESUBMIT |
| 01/22/2025 | RIGHT-OF-WAY REVIEW v.2 | 01/23/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00100
Permit Status: Complete
Permit Description: WO T83703. TEP TO REPLACE 2,725' OF OVERHEAD WIRE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/23/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 01/23/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. . |
| 01/23/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/23/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. ` SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 01/23/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00100
Permit Description: WO T83703. TEP TO REPLACE 2,725' OF OVERHEAD WIRE.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Note from TEP: “JOB IS COMPELTE AS OF 3/7/25. PLEASE CLOSE OUT & FINALIZE PERMIT. OPTION TO FINALIZE IS NOT AVAILABLE. THANK YOU” no barricade inspection was ever requested. | |
| 04/18/2025 | TRSP - ROW - Final | Passed | Note from TEP: “JOB IS COMPELTE AS OF 3/7/25. PLEASE CLOSE OUT & FINALIZE PERMIT. OPTION TO FINALIZE IS NOT AVAILABLE. THANK YOU” | |
| 04/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Note from TEP: “JOB IS COMPELTE AS OF 3/7/25. PLEASE CLOSE OUT & FINALIZE PERMIT. OPTION TO FINALIZE IS NOT AVAILABLE. THANK YOU” no pre-on was ever requested. |