Permit: TR-UTL-0125-00097
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5842 S AVENIDA ISLA CONTOY
Address NEW:
5842 S AVENIDA ISLA CONTOY
Apply Date:
01/16/2025
Applicant:
Chelsey Bolinger
Description:
P.122869C (KAHNA) - **CONTINUATION OF PERMIT TR-UTL-0924-01871** – BORE 4,767’ & TRENCH 179’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (31) FSAI CABINET, HANDHOLES & PEDESTALS.
Permit Reviews
Permit Number - TR-UTL-0125-00097
Permit Status: Complete
Permit Description: P.122869C (KAHNA) - **CONTINUATION OF PERMIT TR-UTL-0924-01871** – BORE 4,767’ & TRENCH 179’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (31) FSAI CABINET, HANDHOLES & PEDESTALS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/17/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00097
Permit Status: Complete
Permit Description: P.122869C (KAHNA) - **CONTINUATION OF PERMIT TR-UTL-0924-01871** – BORE 4,767’ & TRENCH 179’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (31) FSAI CABINET, HANDHOLES & PEDESTALS.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/22/2025 | Driveways and private property shall not be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 01/22/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 01/22/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00097
Permit Description: P.122869C (KAHNA) - **CONTINUATION OF PERMIT TR-UTL-0924-01871** – BORE 4,767’ & TRENCH 179’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (31) FSAI CABINET, HANDHOLES & PEDESTALS.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/06/2025 | TRSP - ROW - Final | Passed |