Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
01/15/2025
Applicant:
Consuelo Adams
Description:
wo#2943798 8731 e la palma dr 15-15-22 nw leaking service in front of property in asphalt 4lf/ar

Permit Reviews

Permit Number - TR-UTL-0125-00092
Permit Status: Complete
Permit Description: wo#2943798 8731 e la palma dr 15-15-22 nw leaking service in front of property in asphalt 4lf/ar
Start Date Submittal Complete Date Status  
01/16/2025 RIGHT-OF-WAY REVIEW v.1 01/21/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00092
Permit Status: Complete
Permit Description: wo#2943798 8731 e la palma dr 15-15-22 nw leaking service in front of property in asphalt 4lf/ar
Total Outstanding Activity Conditions - 2
Date Name
01/21/2025 Emergency – After the fact permit
01/21/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00092
Permit Description: wo#2943798 8731 e la palma dr 15-15-22 nw leaking service in front of property in asphalt 4lf/ar
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/13/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Job already completed final patch already completed. Therefore backfill inspection was not needed at this time.
02/13/2025 TRSP - ROW - Final Passed Patch looks good final pavement treatment looks good seal coating applied 25 feet in both directions

Documents

File Name Document Type  
8731 E LA PALMA DR_SKETCH_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW