Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
01/14/2025
Applicant:
Tucson Electric Power
Description:
WO T112405 - TEP will be working in ROW to install new pad-mounted transformer and new conductor in contractor provided civil duct.

Permit Reviews

Permit Number - TR-UTL-0125-00077
Permit Status: Complete
Permit Description: WO T112405 - TEP will be working in ROW to install new pad-mounted transformer and new conductor in contractor provided civil duct.
Start Date Submittal Complete Date Status  
01/15/2025 RIGHT-OF-WAY REVIEW v.1 01/28/2025 REQUIRES RESUBMIT Review Details
01/30/2025 RIGHT-OF-WAY REVIEW v.2 01/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00077
Permit Status: Complete
Permit Description: WO T112405 - TEP will be working in ROW to install new pad-mounted transformer and new conductor in contractor provided civil duct.
Total Outstanding Activity Conditions - 3
Date Name
01/15/2025 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
01/15/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/15/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00077
Permit Description: WO T112405 - TEP will be working in ROW to install new pad-mounted transformer and new conductor in contractor provided civil duct.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/03/2025 TRSP - ROW - Barricade - Setup/Routine Passed
04/03/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/03/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
04/03/2025 TRSP - ROW - Final Passed