Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
10490 E SKY HIGH DR
Apply Date:
01/14/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVTAE (1) 25X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FOR 10490 E SKY HIGH DRIVE

Permit Reviews

Permit Number - TR-UTL-0125-00074
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (1) 25X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FOR 10490 E SKY HIGH DRIVE
Start Date Submittal Complete Date Status  
01/14/2025 RIGHT-OF-WAY REVIEW v.1 01/15/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00074
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (1) 25X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FOR 10490 E SKY HIGH DRIVE
Total Outstanding Activity Conditions - 2
Date Name
01/14/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/14/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00074
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (1) 25X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FOR 10490 E SKY HIGH DRIVE
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/27/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed on site meeting with Arizona pipeline, reviewed scope of work, upcoming inspections, and traffic control. starting once private property trench reaches right of way, approximately two days.
03/20/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete and the traffic control set up inspection was never requested
03/20/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete and a backfill compaction inspection was never requested
03/20/2025 TRSP - ROW - Final Passed Work is complete. Site is cleaned and suitable for traffic.

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW