Permit: TR-UTL-0125-00074
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
10490 E SKY HIGH DR
Address NEW:
10490 E SKY HIGH DR
Apply Date:
01/14/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVTAE (1) 25X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FOR 10490 E SKY HIGH DRIVE
Permit Reviews
Permit Number - TR-UTL-0125-00074
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (1) 25X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FOR 10490 E SKY HIGH DRIVE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/15/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00074
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (1) 25X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FOR 10490 E SKY HIGH DRIVE
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/14/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 01/14/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00074
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVTAE (1) 25X3 TRENCH ACROSS ASPHALT ROAD ALONG WITH (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO REPLACE GAS SERVICE FOR 10490 E SKY HIGH DRIVE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on site meeting with Arizona pipeline, reviewed scope of work, upcoming inspections, and traffic control. starting once private property trench reaches right of way, approximately two days. | |
| 03/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete and the traffic control set up inspection was never requested | |
| 03/20/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete and a backfill compaction inspection was never requested | |
| 03/20/2025 | TRSP - ROW - Final | Passed | Work is complete. Site is cleaned and suitable for traffic. |