Permit: TR-UTL-0125-00070
Permit Details
Apply Date:
01/13/2025
Applicant:
ANGEL MORALES
Description:
C.3052517 - ACCESS MH 1933 FOR SPLICING
Permit Reviews
Permit Number - TR-UTL-0125-00070
Permit Status: Issued
Permit Description: C.3052517 - ACCESS MH 1933 FOR SPLICING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/13/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/15/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00070
Permit Status: Issued
Permit Description: C.3052517 - ACCESS MH 1933 FOR SPLICING
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
01/14/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
01/14/2025 | Traffic control set-up approved between 9AM - 3:30PM |
01/15/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
01/15/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0125-00070
Permit Description: C.3052517 - ACCESS MH 1933 FOR SPLICING
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |