Permit: TR-UTL-0125-00054
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3940 E TIMROD ST UNIT 217
Address NEW:
3940 E TIMROD ST UNIT 217
Apply Date:
01/09/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X4' BELL HOLE IN ASPHALT ROW AND 1 6'X2' TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0125-00054
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X4' BELL HOLE IN ASPHALT ROW AND 1 6'X2' TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/13/2025 | REQUIRES RESUBMIT |
| 02/25/2025 | RIGHT-OF-WAY REVIEW v.2 | 02/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00054
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X4' BELL HOLE IN ASPHALT ROW AND 1 6'X2' TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 01/13/2025 | ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 01/13/2025 | Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way. |
| 01/13/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/13/2025 | Tucson Fire Department Station 11 access to be maintained at all time. Notification and Contact is required with the Fire Station chief prior to start of work. |
| 01/13/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00054
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X4' BELL HOLE IN ASPHALT ROW AND 1 6'X2' TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/01/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/01/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/01/2025 | TRSP - ROW - Final | Passed |