Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
01/09/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X4' BELL HOLE IN ASPHALT ROW AND 1 6'X2' TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-0125-00054
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X4' BELL HOLE IN ASPHALT ROW AND 1 6'X2' TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE
Start Date Submittal Complete Date Status  
01/10/2025 RIGHT-OF-WAY REVIEW v.1 01/13/2025 REQUIRES RESUBMIT Review Details
02/25/2025 RIGHT-OF-WAY REVIEW v.2 02/25/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00054
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X4' BELL HOLE IN ASPHALT ROW AND 1 6'X2' TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE
Total Outstanding Activity Conditions - 5
Date Name
01/13/2025 ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/13/2025 Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way.
01/13/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
01/13/2025 Tucson Fire Department Station 11 access to be maintained at all time. Notification and Contact is required with the Fire Station chief prior to start of work.
01/13/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00054
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 4'X4' BELL HOLE IN ASPHALT ROW AND 1 6'X2' TRENCH IN DIRT ROW IN ORDER TO REPLACE GAS SERVICE
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/28/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/01/2025 TRSP - ROW - Barricade - Setup/Routine Passed
04/01/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
04/01/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW