Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2119 N SYCAMORE BL
Apply Date:
01/09/2025
Applicant:
JUAN PEREZ
Description:
Excavating a 47'x3' trench to replace gas line service in row in asphalt and dirt.

Permit Reviews

Permit Number - TR-UTL-0125-00050
Permit Status: Complete
Permit Description: Excavating a 47'x3' trench to replace gas line service in row in asphalt and dirt.
Start Date Submittal Complete Date Status  
02/06/2025 RIGHT-OF-WAY REVIEW v.2 02/06/2025 APPROVED Review Details
01/10/2025 RIGHT-OF-WAY REVIEW v.1 01/10/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00050
Permit Status: Complete
Permit Description: Excavating a 47'x3' trench to replace gas line service in row in asphalt and dirt.
Total Outstanding Activity Conditions - 4
Date Name
01/10/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/10/2025 Traffic Control set-up approved between 7AM - 5PM
01/10/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRA PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
01/10/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00050
Permit Description: Excavating a 47'x3' trench to replace gas line service in row in asphalt and dirt.
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/25/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/21/2025 TRSP - ROW - Barricade - Setup/Routine Passed
05/21/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
05/21/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW