Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0125-00040
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
321 S KINO PW
Address NEW:
321 S KINO PW
Apply Date:
01/07/2025
Applicant:
Cox Communications
Description:
Cox to overlash 838' of aerial to existing strand and trench 16' to install CATV conduit and remove and replace vault for system tie.
Permit Reviews
Permit Number - TR-UTL-0125-00040
Permit Status: Complete
Permit Description: Cox to overlash 838' of aerial to existing strand and trench 16' to install CATV conduit and remove and replace vault for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/08/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/10/2025 | REQUIRES RESUBMIT |
| 01/17/2025 | RIGHT-OF-WAY REVIEW v.2 | 01/21/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00040
Permit Status: Complete
Permit Description: Cox to overlash 838' of aerial to existing strand and trench 16' to install CATV conduit and remove and replace vault for system tie.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/09/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00040
Permite Description: Cox to overlash 838' of aerial to existing strand and trench 16' to install CATV conduit and remove and replace vault for system tie.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00040
Permit Description: Cox to overlash 838' of aerial to existing strand and trench 16' to install CATV conduit and remove and replace vault for system tie.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/05/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/05/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/02/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 04/02/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 05/27/2025 | TRSP - ROW - Final | Passed |