Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
432 E PRESIDENT ST
Apply Date:
01/03/2025
Applicant:
Desert Barricades LLC
Description:
WO T117663 - Crews will park in the COT ROW on the south side of E President St. to replace (2) Telco poles, install (2) TEP poles, and remove (1) TEP pole. Additionally, they will replace OH conductors, OH attachments & OH transformers.

Permit Reviews

Permit Number - TR-UTL-0125-00015
Permit Status: Complete
Permit Description: WO T117663 - Crews will park in the COT ROW on the south side of E President St. to replace (2) Telco poles, install (2) TEP poles, and remove (1) TEP pole. Additionally, they will replace OH conductors, OH attachments & OH transformers.
Start Date Submittal Complete Date Status  
01/03/2025 RIGHT-OF-WAY REVIEW v.1 01/07/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0125-00015
Permit Status: Complete
Permit Description: WO T117663 - Crews will park in the COT ROW on the south side of E President St. to replace (2) Telco poles, install (2) TEP poles, and remove (1) TEP pole. Additionally, they will replace OH conductors, OH attachments & OH transformers.
Total Outstanding Activity Conditions - 2
Date Name
01/03/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
01/03/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0125-00015
Permit Description: WO T117663 - Crews will park in the COT ROW on the south side of E President St. to replace (2) Telco poles, install (2) TEP poles, and remove (1) TEP pole. Additionally, they will replace OH conductors, OH attachments & OH transformers.
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/03/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/07/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/07/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
03/04/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
AERIAL PERMIT MAP_WO T117663_V1.PDF DOCUMENTS VIEW
DB 70371 - 432 E PRESIDENT ST - FLAGGER VARIOUS - T117663_V1.PDF DOCUMENTS VIEW