Permit: TR-UTL-0125-00003
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6524 S 6TH AV
Address NEW:
6524 S 6TH AV
Apply Date:
01/02/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Permit Reviews
Permit Number - TR-UTL-0125-00003
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 01/02/2025 | REQUIRES RESUBMIT |
| 01/07/2025 | RIGHT-OF-WAY REVIEW v.2 | 01/09/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0125-00003
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/09/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 01/09/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 01/09/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0125-00003
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas leak
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/29/2025 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 01/29/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 01/29/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 01/29/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 01/29/2025 | TRSP - ROW - Final | Passed |