Permit: TR-UTL-0124-00172
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2414 N SAHUARA AV
Address NEW:
2414 N SAHUARA AV
Apply Date:
01/29/2024
Applicant:
ANGEL MORALES
Description:
wo#2733319 2414 n sahuara av 13-14-36 se rpr lkng main front westside of lot at the concrete driveway 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0124-00172
Permit Status: Complete
Permit Description: wo#2733319 2414 n sahuara av 13-14-36 se rpr lkng main front westside of lot at the concrete driveway 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/31/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/31/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0124-00172
Permit Status: Complete
Permit Description: wo#2733319 2414 n sahuara av 13-14-36 se rpr lkng main front westside of lot at the concrete driveway 6LF/sc
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 01/31/2024 | Sidewalk |
| 01/31/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0124-00172
Permite Description: wo#2733319 2414 n sahuara av 13-14-36 se rpr lkng main front westside of lot at the concrete driveway 6LF/sc
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Re-inspection required | |
| 03/12/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 03/12/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0124-00172
Permit Description: wo#2733319 2414 n sahuara av 13-14-36 se rpr lkng main front westside of lot at the concrete driveway 6LF/sc
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 03/12/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/23/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/23/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 09/23/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed |