Description:
1 5x5 bell hole in concrete / asphalt to replace gas line

Permit Reviews

Permit Number - TR-UTL-0124-00126
Permit Status: Inspections
Permit Description: 1 5x5 bell hole in concrete / asphalt to replace gas line
Start Date Submittal Complete Date Status  
01/29/2024 RIGHT-OF-WAY REVIEW v.2 02/05/2024 APPROVED Review Details
01/19/2024 RIGHT-OF-WAY REVIEW v.1 01/19/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0124-00126
Permit Status: Inspections
Permit Description: 1 5x5 bell hole in concrete / asphalt to replace gas line
Total Outstanding Activity Conditions - 3
Date Name
01/19/2024 Traffic Control set-up approved between 7AM - 5PM
01/19/2024 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
02/05/2024 (Contact Nick Germanos prior to start of work at Nick.Germanos@tucsonaz.gov) (411 Restoration work) OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0124-00126
Permite Description: 1 5x5 bell hole in concrete / asphalt to replace gas line
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/13/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Partial Pass
03/13/2024 TRSP - ROW - Barricade - Setup/Routine N/A Partial Pass
03/13/2024 TRSP - ROW - Barricade Takedown N/A Partial Pass
10/08/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0124-00126
Permit Description: 1 5x5 bell hole in concrete / asphalt to replace gas line
Total Completed Inspections - 3
Date Description Inspector Results Comments
02/27/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/13/2024 TRSP - ROW - SWBMP Passed
08/21/2024 TRSP - ROW - Bituminous Treatment Passed