Permit: TR-UTL-0124-00068
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5674 E 25TH ST
Address NEW:
5674 E 25TH ST
Apply Date:
01/10/2024
Applicant:
BILL YACKLEY
Description:
P.090268 KAHNA (PERMIT D) - BORE 541' AND TRNCH 4' TO PLACE CTL CONDUIT & CTL FIBER CABLE AND OVERLASH 1,404' AERIAL CABLE.
Permit Reviews
Permit Number - TR-UTL-0124-00068
Permit Status: Complete
Permit Description: P.090268 KAHNA (PERMIT D) - BORE 541' AND TRNCH 4' TO PLACE CTL CONDUIT & CTL FIBER CABLE AND OVERLASH 1,404' AERIAL CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/11/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0124-00068
Permit Status: Complete
Permit Description: P.090268 KAHNA (PERMIT D) - BORE 541' AND TRNCH 4' TO PLACE CTL CONDUIT & CTL FIBER CABLE AND OVERLASH 1,404' AERIAL CABLE.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/10/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 01/10/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 01/10/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0124-00068
Permite Description: P.090268 KAHNA (PERMIT D) - BORE 541' AND TRNCH 4' TO PLACE CTL CONDUIT & CTL FIBER CABLE AND OVERLASH 1,404' AERIAL CABLE.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0124-00068
Permit Description: P.090268 KAHNA (PERMIT D) - BORE 541' AND TRNCH 4' TO PLACE CTL CONDUIT & CTL FIBER CABLE AND OVERLASH 1,404' AERIAL CABLE.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/08/2025 | TRSP - ROW - Final/Close-Out | Passed | Work is now complete |